Religious buildings primarily provide a place of worship but often also include other facilities such as classrooms, multipurpose hall, commercial kitchen, gymnasium, and offices. Designing mechanical and electrical systems for each of these facilities involve many unique challenges that must be carefully addressed.
KES Engineering has successfully designed mechanical and electrical systems for religious facilities including renovations, additions, and completely new facilities with capacity from 500 to 3000 people sanctuary.
BALTIMORE FIRST SEVENTH DAY ADVENTIST
KES Engineering, Inc. provided mechanical, electrical, Plumbing, and Fire protection systems design and construction period services for this new sanctuary addition of approximately 11,000 sq. ft.
The design included multiple HVAC packaged rooftop units; low-pressure air distribution to meet NC-25; Normal and Emergency power distribution; Interior and exterior lighting; Fire alarm, communication, and wet-pipe fire suppression systems design.

SHEPHERD GATE CHURCH, VIRGINIA
KES Engineering, Inc. provided mechanical and electrical engineering design and construction period service for this new worship center of approximately 24,000 sq. ft. including an 800-Seat sanctuary, multipurpose hall, administrative areas, and classrooms.
The design included multiple HVAC packaged energy recovery rooftop units; low-pressure air distribution to meet NC-25; a New DDC central energy management building control system; electrical power distribution; Interior and exterior lighting; Fire alarm, communication, and wet-pipe fire suppression systems.

HUBER MEMORIAL CHURCH, BALTIMORE
KES Engineering, Inc. provided mechanical and electrical engineering design for this new worship center of approximately 40,000 sq. ft. including the 1500-Seat sanctuary, multipurpose hall, administrative areas, commercial kitchen, and classrooms. The building is being designed to meet LEED Silver rating.
The design included multiple HVAC packaged energy recovery rooftop units; low-pressure air distribution to meet NC-25; a New DDC central energy management building control system; electrical power distribution; Interior and exterior lighting; Fire alarm, communication, and wet-pipe fire suppression systems.

FIRST BAPTIST CHURCH OF MARSHALL HEIGHTS,
WASHINGTON, D.C.
KES Engineering, Inc. provided mechanical, electrical, Plumbing, and Fire protection systems design for the new addition of approximately 12,000 sq. ft. to the existing worship center.
The design included multiple HVAC packaged rooftop units; low-pressure air distribution to meet NC-30; upgrading of electrical incoming service, upgrading of incoming water service for domestic and fire suppression purposes, electrical power distribution; Interior and exterior lighting; Fire alarm, communication, and new fire pump for wet-pipe fire suppression systems.

INTERDENOMINATIONAL CHURCH OF GOD, GAITHERSBURG
KES Engineering, Inc. provided mechanical and electrical engineering design for this new worship center of approximately 30,000 sq. ft. including a 1000-Seat sanctuary, multipurpose hall, administrative areas, commercial kitchen, and classrooms.
The design included multiple HVAC packaged rooftop units; low-pressure air distribution to meet NC-25; a New DDC central energy management building control system; electrical power distribution; Interior and exterior lighting; Fire alarm, communication, and wet-pipe fire suppression systems.